Permax Australia are working closely with multiple teams on this project, with the specific task of applying Nullifire thin film intumescent.
This week, the first girder was air-lifted into place on level 2 of the podium.
This 270m+ building will be a mix of residedntial aprtments and hotel rooms, whilst the Podium where this was being lifted will house a mix of open spaces and dining options and will sit on one of the three precincts being developed on the foreshore of Darling Harbour on the old site of the Industrial Docks.
This video on the Robert Bird LinkedIn profile shows just how impressive this steel section really is!
Get in Touch
Speak to the Australian leaders in passive fire protection
You are about to download a file from the Permax site. Please note All technical advisory notes generated by Permax are based on research papers, indicative fire tests and any other existing evidence. These documents should not be used as an official evidence as design engineers should review the information and determine the reliability of the documents.
Permax constantly update the documentations based on the new fire testing outcomes and change of standards and regulations. To ensure the documents you read are up-to-date, please contact the Permax technical team.